Équipement aéroportuaire AAS-BRIDGE A3-60/119
Publié: 6mois 12jour(s)
Publié: 6mois 12jour(s)
Crédit-bail
Disponible sur demandeAvez-vous besoin d'expédition?
Obtenir un devis d'expédition
Refurbished
-
Capacity: Not set
-
Sale
-
Passenger boarding bridgePassenger Boarding Bridge 3 Steel Tunnel Bridge Mechanical fully refurbished Electrical fully refurbished A3-60/119 (18.3/36.3 meters) New Operating System: Version 2023 Including Rotunda and column Available from September 2023 Excluding dismantling or installation costs Options we can arrange: Dismantling Bridges for transport Transportation to the new destination Installation on site SAT and Commissioning on site Our A3-60/119 (18,3/36,3 meter) bridge is a 3 steel tunnel bridge, which ensures a smooth and safe operation for embarking and disembarking of the passengers. Understanding the importance of the safe and smooth operation, we have fully refurbished this bridge to ensure top performance. A “full refurb is including the renewal of mechanical and electrical parts, but also this bridge is equipped with the latest control system (version 2023), making it very efficient, safe, and user-friendly to operate. We also refurbished the rotunda and column. This complete Passenger Boarding Bridge, painted in white (RAL9010) is NOW FOR SALE. We can offer and arrange the dismantling of the PBB, transportation to your requested location, re-install the PBB, and doing an SAT (Site Acceptance Test) and commissioning on site.
Avez-vous besoin d'expédition?
Obtenir un devis d'expédition
Crédit-bail
Disponible sur demandeAvez-vous besoin d'expédition?
Obtenir un devis d'expédition
Avez-vous besoin d'expédition?
Obtenir un devis d'expédition